Legal Framework & Project Overview

"Jo Allah ke liye masjid banata hai, Allah uske liye jannat mein ghar banata hai."

— Al-Hadith

This proposal document provides a comprehensive technical overview and financial breakdown for the construction of Masjid Maulana Deen Muhammad located at Village Bai, District Nuh (Mewat), Haryana. The execution of this project is completely overseen and managed by AIDM Technology Trust, a registered non-profit organization dedicated to transparent community infrastructure development.

Mewat remains one of the most economically under-resourced regions in the country. Constructing a dedicated, high-quality, G+1 RCC column structural masjid will provide critical community space, a clean prayer hall, and safe spaces for Islamic education to the local community in Village Bai.

Statutory Registrations & Identifications

For administrative transparency and financial governance, the Trust operates under the following valid legal certifications. All national donations qualify for tax exemptions under prevailing statutes.

Direct Donation Details

Scan the QR code below via any UPI app (GPay, PhonePe, Paytm, BHIM) to donate directly.

Union Bank UPI QR Code
Official Account Info
ALL INDIA DEENI MADARIS JADEED TECHNOLOGY TRUST
UPI ID: QR919812766623-0592@unionbankofindia
Direct Bank Transfer:
Bank: Union Bank of India
Branch: Nuh Branch, Mewat
A/C Number: 579601010050592
IFS Code: UBIN0557960
Pay Directly via UPI App
View Official Payment Flyer

PART A: Civil Structure Phase (Core Superstructure)

The structural framework is engineered as a heavy RCC column-and-beam frame structure with extra deep foundations to safely manage future expansion to the first floor without altering ground layout elements.

Scope of Work Item Description Qty Unit Rate (₹) Amount (₹)
Site Clearing & Leveling works 1,200 Sq.ft 20 24,000
Excavation works (Neev ki gehri khodai) 180 Cum 450 81,000
PCC (Plain Cement Concrete for structural base) 20 Cum 6,500 1,30,000
RCC Foundation (Heavy isolated footings for G+1 load) 35 Cum 9,500 3,32,500
RCC Columns (18 Structural Columns frame setup) 18 Cum 10,500 1,89,000
RCC Beams (Plinth, Tie and Roof beams matrix) 15 Cum 10,500 1,57,500
RCC Roof Slab (High strength ceiling lantar concrete) 22 Cum 10,500 2,31,000
Brick Work (9" External boundary & 4.5" Internal separation) 65 Cum 8,500 5,52,500
Internal Plaster (Smooth finish wall leveling) 6,200 Sq.ft 45 2,79,000
External Plaster (Weatherproof protective sand coating) 2,200 Sq.ft 55 1,21,000
Subtotal Core Civil Work Phase (Approximate) ₹20,00,000

PART C & D: Interior, Openings & MEP Infrastructure

Finishing Subhead Dimensional Allocation & Details Allotted Cost (₹)
Premium Flooring Granite (1200 Sq.ft Hall), Toilet Tiles (250 Sq.ft), Wuzu Area Tiles (180 Sq.ft), Staircase Granite (120 Sq.ft) 2,40,000
Doors (Wooden/Iron) 1 Large Arch Ornamental Entrance Door, 5 Flush Internal Doors 1,20,000
Windows System 12 Customized High-Grade Aluminum Arch Windows with Grills 1,30,000
Paint & Putty Matrix 220 Bags Putty, 180L Primer, 140L Ext. Paint, 220L Interior Emulsion 1,40,000
Electrical & Sound LED Panels, 14 Fans, concealed speaker/amplifier lines, AC points, CCTV cabling lines 1,60,000
Plumbing & Sanitary 8 Brass Taps for Wuzu, 2 Indian/Western WC, 2000L Tank, CPVC pipeline network 1,50,000
Masjid Carpet 900 Sq.ft Premium Quality Imported High-Density Soft Prayer Carpet 2,25,000
False Ceiling 1,200 Sq.ft Acoustic & Seamless Gypsum Board Ceiling with Profile Light slots 1,80,000
Front Elevation Setup Mihrab Arch shaping, CNC jali, 2 Minarets, ACP Sign Board & Backlit LED Name Plate 2,50,000
Subtotal Interior, Finishing & MEP Phase (Approximate) ₹11,50,000

Consolidated Materials Inventory

Material Item Net Vol/Qty
Cement1,150 Bags
Steel (Fe550 TMT)18 MT
Bricks (Class-I)42,000 Nos
Sand (Reti)5,000 CFT
Aggregate (Rori)2,500 CFT
Stone Dust1,500 CFT
Granite / Tiles1,750 Sq.ft
Paints / Putty360L / 220B
Aluminium Windows12 Nos
Doors (Main + Int)6 Nos
Lights & Fans24 LED / 14 Fans

Skilled Labor Allocation Matrix

Trade / Crew Type Cost Allocation (₹)
Senior Mason (Rajmistri + Team)4,20,000
General Labor Workforce3,50,000
Bar Bender (Sariya binding)1,50,000
Carpenter & Formwork1,20,000
Finishing Painter Crew1,20,000
Tile / Granite Mason1,00,000
Electrician Technicians80,000
Plumbing System Installer75,000
Total Labor Budget ₹14,15,000

Project Financial Consolidation

To implement maximum optimization, AIDM Technology Trust uses a self-managed construction strategy. By purchasing directly from primary suppliers and minimizing contractor overhead, significant savings overlap has been applied below.

Project Construction Phase Description Cost Outlay (₹)
1. Civil Structure Works Framework (Phase-A) 20,00,000
2. Interior Finishing, MEP Services & Front Elevation (Phase-B,C,D) 11,50,000
3. Skilled & General Labor Operations Matrix 14,15,000
4. Deductions: Contractor Optimization & Direct Material Procurement Savings (-) 9,15,000
ESTIMATED GRAND TOTAL PROJECT BUDGET ₹36,50,000